Progress on the restoration of a 1947 Cessna 140 s/n 12403
Monday, October 26, 2009
Left wing
Inspected structure.
Installed tank.
Installed root braces.
Replaced outboard drag wire per AD 48-25-03.
Checked and set trammel, tightened wires and jamb nuts per SLN-27.
No comments:
Post a Comment